During the period
of the construction work, environmental protection is very important for
the workers and public safety. The key points of environmental
protection are below:
1.
Environmental Control
All involving
persons should Submit the proposal for the traffic movement, temporary
structure, (included camps), cleaning up (including burning off),
erosion control, erect camps, remove trees or shrubs, cuttings, fence,
water, sewerage or power lines to the superintendent.
2.
Fire protection
The extinguishers
shall be prepared permanently at the construction site. No burning
components on the site.
3.
Delivery of Materials
Delivery of
materials for the construction schedule and process should be the
permission between the project manager and the superintendent.
4.
Storage on site
All materials and
equipments will be stored properly at the construction site in order to
prevent damages. The storage areas will be cleared and cleaned to
minimize hazards for all persons, materials and equipments moving from
one place to another place.
5.
Noise control
The schedule in a
Gant chart format will be prepared in coordination with the
superintendent to do parallel with the necessary demolition works, which
can be undertaken with a minimum of disturbance for the public. All
precautions will be taken to minimize noise resulting from work. All
construction equipments will be moved to avoid with nose. Supervisors
will look about that noisy equipment to minimize.
6.
Jackhammer Silencing
All Jackhammer and
other noisy hand held tools would be used to fit in the performance of
the work with effective of a type, which recommended by the jackhammer
manufacturer. All tools and silencers will be kept in first class
condition. Operators of Jackhammers will be supervised to ensure that
the silencers are always in place while the tools are being used.
7.
Disposal of contaminants
Disposal of all
solid, liquid and gaseous containers will be done properly in accordance
with al statutory and local requirements. Grease contaminants will be
discharged and diluted with fresh air, sufficiently to reduce toxicity
to an acceptable level. Subject to statutory and local requirements.
Liquid contaminants may be diluted with water to a level of quality
acceptable in the sewer system or shall be contained in approved vessels
of disposal at approved site. Dispose of solid contaminant will be
removed from site to approved location or as otherwise directed place by
the superintendent.
8.
Disposal of
Refuse
Disposal of Refuse
will be removed from the site, including food scraps, which are
resulting from work. For dropping refuse, use hoppers and shutters,
shutters or refuse buckets, which are covered or such of a design as to
confine the material completely and prevent dust emission.
9.
Trucking
All trucks taking
earth materials or loss debris will be loaded from the site in a good
manner that will prevent dropping of materials on the streets. Fasten
suitable tarpaulins over the load before it leaves the site. Similarly
load and cover trucks bringing loose materials to the site. Ensure that
the wheels, truck and body surface of all vehicles and plant leaving the
site are free of mud and that mud is not carried to adjacent paved
streets or other areas.
10.
Installed
Equipment
Protect, installed
equipment against damage by dust, dirt and shock.
11.
Soil
Conservation
Prevent erosion of soil
from any lands used or occupied in the execution of the work.
12.
Existing
Flora
All adequately,
protect from damage for all trees and other plants which need not be
removed or destroyed for construction operation or which are shown on
the Drawing to specify to be retained.
Site concrete
mixes will be in a position where wind cannot damage blow cement to the
trees and plants.
13.
Latrines
To be ensured that
the hygiene condition in the construction area. The latrines should be
constructed. The waste from the specific tank will be directed to the
public sewers. When public sewers are not available, a private system
will be built. The liquid flows into a distribution system, which
distributed the liquid into a wide underground. The sun evaporation
between the liquid and the ground are absorbing the liquid. Two or more
latrines will be built depending on the number of workers and it is
designed for services.
|