No. |
Project
Name |
Client/Employer/Financer |
Duration |
|
Year |
|
001 |
Project for
Installation of Kilometer Post along RN6 & RN7 ( Stage 1) |
JICA-Cambodia (Japan) |
2 months (2006) |
|
002 |
Project for
Installation of Kilometer Post along RN6 & RN7 ( Stage 2) |
JICA-Cambodia (Japan) |
2 months (2007) |
|
003 |
Topographic
Survey for Samdech Hun-Sen Boulevard Project (phase 1) |
PYUNGHWA Engineering Consultant Ltd. (PEC), |
1 month (2007) |
|
004 |
Topographic
Survey for Tonle Bati Farm Development Project |
PYUNGHWA Engineering Consultant Ltd. (PEC), |
2 months (2007) |
|
005 |
Architectural and Structural Design for tender Document of
Kampong Chhang Hospital Project |
KOICA
(KOREA) |
2 months (2007) |
|
006 |
Road
Planning Study for BOT Investment in Cambodia |
SOU CHING JST
Co., Ltd |
4 months (2007) |
|
007 |
Batheay Flood Control Project:Leveling Topography Survey (LS) for 45 km |
MOWRAM/Yooshin (Korea)/KOICA |
1 month (2007) |
|
008 |
Environmental & Social Condition Survey for Sihanoukville SEZ Development Project |
JBIC (Japan) |
3 months (2007) |
|
009 |
Construction of Batheay Flood Control Project:Topographic Survey for 6 km of dam & canal construction. Cambodia |
MOWRAM/Yooshin-TongWoo (Korea)/KOICA |
12 months (2007-2008) |
|
010 |
Sorya Paper Factory Project: Architectural and Structural Detail Design and Construction License Processing. Cambodia. Cambodia |
Sorya Paper Co./Yeawon (Korea)/Sorya Paper Co. |
3 months (2008) |
|
011 |
Land and Housing Development Project: Topographical Survey and Landscape Design. Cambodia. |
BK Asia Pacific Co., Ltd (Korea)/Yeawon E&C/BK Asia |
1 month (2008) |
|
012 |
Cambodian Railway Restructuring Project:IT Development for CMC Secretariat (Database and Website Design, and Maintenance) Cambodia. |
MPWT/CMC/RGC-ADB |
9 months (2008-2009) |
|
013 |
Project Performance Evaluation Report (ADB Loan): Traffic Survey and Resettlement/Socioeconomic Evaluation Survey for the Completion Project of NR5, NR6 and NR7. Cambodia. |
ADB/ADB-OED2/ADB |
2 months (2008-2009) |
|
014 |
Cambodia - Korea Friendship Project of Siem Reap Bypass Road:Road Topographical Survey. Cambodia. |
APSARA Authority/PEC (Korea)/KOICA |
2 months (2009) |
|
015 |
GMS Railway Strategy Study Project:Road-Rail Transport Survey and Data Collection in Cambodia, Loa PDR, Thailand and Vietnam |
ADB-GMS/CANARAIL (Canada)/ADB |
3 months (2009) |
|
016 |
Public Private Partnership of NR6 and NR7 Project:Investment Feasibility Study (Traffic Survey, Topographical Survey, Preliminary Design, BOQ Calculation and Financial Modeling of Investment). Cambodia. |
MPWT/C&J Holdings (Korea)/C&J |
6 months (2009-2010) |
|
017 |
Various ADB Projects in Cambodia:Social Safeguard Documents Review and Implementation Evaluation |
ADB/ADB-SEAD/ADB |
3 months (2010) |
|
Total
Sale |
|
|